Abstract
NASA's Neutron star Interior Composition Explorer (NICER) progressed smoothly through its final ground-test activities in 2016 and early 2017, in preparation for a spectacular launch and installation on the International Space Station in June 2017. Activation of the payload and initial calibration of its systems followed, rounding out Phase D, Testing and Commissioning, of the mission's development cycle. We describe the final ground verification measurements of NICER's key performance parameters, such as the X-ray Timing Instrument's photon energy resolution and time-stamping accuracy, as well as in-flight effective collecting area, pointing, background, and other calibration efforts. The payload meets all of its design requirements and is poised to deliver new insights in soft X-ray astrophysics; briefly, we touch on early science returns that showcase NICER's unique capabilities.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.