Abstract
Plastic injection mould manufacturing process is a job-shop scheduling problem (JSSP) and a non-polynomial (NP) problem. This study developed a mould-manufacturing scheduling navigation system in which the genetic algorithm (GA) was applied to optimise the mould-manufacturing scheduling problem. A navigation process ranging for manufacturing process planning and manufacturing scheduling was planned, and scheduling management was planned, while considering the processing restrictions needed to effectively manage and arrange all the components to be processed in a more reasonable way. The study used the searching capabilities of GA for determining the sequence of component processing with limited machines during mould manufacturing, and computed the makespan of the components currently planned in the factory. Compared with the makespan of manual planning in real cases, the proposed system can save up to 50% of the working time, and the quality of the solution can provide production management staff with a better reference in improving actual scheduling jobs. The proposed system can be used to effectively plan and manage component processes, accelerate the scheduling and shorten mould manufacturing time, in order to achieve the objectives of reducing the production cost and improving the competitiveness of an enterprise.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Computer Integrated Manufacturing
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.