Abstract

Since March 1978 the Fermilab Booster has operated with H-multiturn charge exchange injection. A record number of protons per Booster cycle has been injected and accelerated to 8 GeV. The details of the injection system are discussed as well as the Booster performance and the reliability of the method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.