Abstract

AbstractIn construction projects, resource availability might limit the implementation of ideal schedules. Especially, when repetitive activities are involved, traditional resource‐constrained project scheduling problem (RCPSP) models fail to allocate the resource consumption in an efficient manner. Besides, actual models only provide local optimal solutions and do not incorporate activity acceleration routines. To fulfill this gap, partially, a mathematical optimization model, the multimode RCPSP for repetitive activities in construction projects, is proposed and solved to optimality; it takes into account acceleration routines under real construction scenarios using spreadsheets. The article shows a complete computational experimentation over a real construction project, considering several scenarios of resource availabilities and continuity conditions. The model allows analyzing the resources efficiency indexes comparing them to resource consumptions, continuity of activities, and objective functions that reveal that fragmented activities do not provide better resource efficiency outcomes.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call