Abstract

This paper deals with a multi-period extension of the p-center problem, in which arc traversal times vary over time, and facilities are mobile units that can be relocated multiple times during the planning horizon. The problem arises in several applications, such as emergency services, in which vehicles can be relocated in anticipation of traffic congestion. First, we analyze the problem structure and its relationship with its single-period counterpart, considered as a special case. Then, the insight gained with this analysis is used to devise a decomposition heuristic. Computational results on instances based on the Paris (France) road graph indicate that the algorithm is capable of determining good-quality solutions in a reasonable execution time.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call