Abstract

The calorimeter of the Mu2e experiment is being assembled, with all production components completed and tested, apart from the digital electronics that is still underway. The mechanical structure is fully built, with a complete integration and test of all the analog sensors and electronics. We summarize construction and assembly phases, Quality Control tests, calibration procedures and first tests performed in the assembly area, as well as the installation and commissioning plans of the final disks in the Mu2e hall.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.