Abstract

Application of the GE MS5001 gas turbine performance improvement uprate package has been extended to an early model “K” unit at Texaco’s Convent, LA refinery. This extensive modification required replacement of the turbine shell in addition to the installation of new technology components developed for more recent MS5001 models. This paper presents the customer’s motivation to refurbish a 22 year old gas turbine. Gas turbine component design improvements and interfaces are discussed with performance and reliability gains. Field service engineering experience installing the uprate is also related.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.