Abstract

With the increasing demand for high quality steel, various secondary refining techniques have been developed in the past decades. RH powder top blowing process (RH-PTB) is practiced in industry to decrease the impurity content of steel in a more economical way. In the present work, based on similarity theory, RH powder top blowing process was simulated by water model, and the effects of operating parameters on mixing time were investigated. The results show that the injected powder had a negligible effect on mixing time in RH-PTB, and the mixing time increases with top lance gas flowrate and decreases with lifting gas flowrate of up-leg. It was found that the mixing time was no longer decreasing as the lifting gas flowrate was over 15 L/min. Moreover, the height of top lance has some effect on mixing time in the reactor, and it should be adjusted to specific circumstances for purposes.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.