Abstract

The miniature presented here is the synthesis of how the Siparti 3-S as an approach and practice in dealing with the community empowerment under the UPP (Urban Poverty Project) in Indonesia. The notion of Siparti 3-S as an approach was applied specifically to build and operate a KSM in a kelurahan area in the year of 2000 – 2001 of UPP1 second phase. The practice of how Siparti 3-S applied through the KSM Sibermas project was inspired and motivated by the previous successful of the author’s project in executing a training program for the retrenched tertiary graduates who had lost their jobs due to the financial crisis during 1998, under the project was known as P3T – Proyek Penanggulangan Pengangguran Pekerja Terampil (Skilled Workers Unemployment Project). Utilization of waste materials to produce sound economic and environmental-friendly products was the theme of project run by KSM Sibermas . Based on the field experience of the author and members of KSM Sibermas in accomplishing the project, found that the Siparti 3-S was effective in building synergistically the three main resources, namely: human (the training participants), nature & environment (waste materials & garbage dump), and social-culture (the mindset and the behavior toward handling waste materials).

Highlights

  • ! Figure 10: KSM Sibermas Project viewed as a miniature of Siparti-3S* (Source:!Slightly!modified!from!Witjaksono,!2000:!7!&!2001:!13)!! ! The!intersection!represents:!

  • The' group' as' a' whole' has' an' advantage' over' its' individual' participants' in' solving'

Read more

Summary

Abstract*

The* miniature* presented* here* is* the* synthesis* of* how* the* Siparti* 3TS* as* an*. UPP* (Urban* Poverty* Project)* in* Indonesia.* The* notion* of* Siparti* 3TS* as* an* approach* was* applied* * to* build* and* operate* a* KSM* in* a* kelurahan*. Area* in* the* year* of* 2000* –* 2001* of* UPP1* second* phase.* The* practice* of* how*. Siparti* 3TS* applied* through* the* KSM* Sibermas* project* was* inspired* and*. Motivated* by* the* previous* successful* of* the* author’s* project* in* executing* a*. Due* to* the* financial* crisis* during* 1998,* under* the* project* was* known* as* P3T* –*. KSM* Sibermas.* Based* on* the* field* experience* of* the* author* and* members* of*. KSM* Sibermas* in* accomplishing* the* project,* found* that* the* Siparti* 3TS* was* effective* in* building* synergistically* the* three* main* resources,* namely:* human*.

INTRODUCTION*
1* INTRODUCTION N*
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call