Abstract

In order to ensure the safe operation of ship power system, it is necessary to remove some lower priority loads when the generators output power is insufficient, which requires reasonable priority for each ship power system loads. According to the ship loads start-up time, starting current, power factor, harmonic factor and the rated power, the improved grey analytic hierarchy process was used to provide a basis for evaluation of reasonable, which can be used to set the priority of the loads and realize the reasonable distribution of power.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.