Abstract
Purpose. Across the track superstructure (TSS) there are structures where standard approach to the decision on the future of their operation is not entirely correct or acceptable. In particular, it concerns the track sections which are sufficiently quickly change their geometric parameters: the radius of curvature, angle of rotation, and the like. As an example, such portions of TSS may include crossovers where their component is within the so-called connecting part, which at a sufficiently short length, substantially changes curvature. The estimation of the position in terms of a design on the basis of the existing technique (by the difference in the adjacent arrows bending) is virtually impossible. Therefore it is proposed to complement and improve the methodology for assessing the situation of the curve in plan upon difference in the adjacent versine. Methodology. The possible options for measuring horizontal curves in the plan were analyzed. The most adequate method, which does not contradict existing on the criterion of the possibility of using established standards was determined. The ease of measurement and calculation was took into account. Findings. Qualitative and quantitative verification of the proposed and existing methods showed very good agreement of the measurement results. This gives grounds to assert that this methodology can be recommended to the workers of track facilities in the assessment of horizontal irregularities in plan not only curves, but also within the connecting part of switch congresses. Originality. The existing method of valuation of the geometric position of the curves in the plan was improved. It does not create new regulations, and all results are evaluated by existing norms. Practical value. The proposed technique makes it possible, without creating a new regulatory framework, to be attached to existing one, and expanding the boundaries of its application. This method can be used not only for ordinary curves, but for very short sections, the curvature of which changes abruptly to its opposite value.
Highlights
On the Ukrainian railway network for the past several decades has been a tendency to increase the speed of motion [9], which obviously leads to the revision of existing and the creation of new regulatory documents
It is necessary to develop a methodology for assessing the phase position of the road in such a way as to reduce the time spent on measurement and processing of the results
It can be assume that the technique can be used to assess the status of the curve track section with an abrupt change of curvature
Summary
On the Ukrainian railway network for the past several decades has been a tendency to increase the speed of motion [9], which obviously leads to the revision of existing and the creation of new regulatory documents. This applies to rail transport as a whole and of its individual farms. The track facilities directly involved in the maintenance and repair of road infrastructure. For the track state establishment in accordance with the maintenance norms the instrumental methods was used to evaluate its status
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.