Abstract

The long-term forecasting of electricity demand and supply has assumed significant importance in fundamental research to provide sustainable solutions to the electricity issues. In this article, we provide an overview of structure of electric power sector of Pakistan and a summary of historical electricity demand & supply data, current status of divergent set of energy policies as a framework for development and application of a LEAP (Long-range Energy Alternate Planning) model of Pakistan's electric power sector. Pakistan's LEAP model is used to analyze the supply policy selections and demand assumptions for future power generation system on the basis of economics, technicality and implicit environmental implications. Three scenarios are enacted over the study period (2011–2030) which include BAU (Business-As-Usual), NC (New Coal) & GF (Green Future). The results of these scenarios are compared in terms of projected electricity demand & supply, net present cost analysis (discount rate at 4%, 7% and 10%) and GHG (greenhouse gas) emission reductions, along with sensitivity analysis to study the effect of varying parameters on total cost. A concluding section illustrates the policy implications of model for futuristic power generation and environmental policies in Pakistan.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call