Abstract

With the global economic integration of the sustainable development, international companies increased investment in China as well as numerous international projects in favor of ' made in China ', project logistics in China is being closely watched by construction industry. It is important significance of the high risk of project logistics solutions for risk assessment in the meticulous management of engineering project and under the trend of risk control requirements. Based on the T hydropower project as an example, first this article analysis the hydropower equipment logistics risk factors through the Hall of three-dimensional risk factors for three dimensional analysis model, then according to the method of fault tree analysis, from qualitative and quantitative perspectives on risk for the occurrence of the minimum cut sets, the minimum path sets, top event probability and the probability importance degree are analyzed .Through the analysis of the results, it may occur in the process of risk for large equipment logistics and puts forward the corresponding countermeasures and measures.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.