Abstract

The present location of the East Siberian cement industry is irrational because it does not correspond to the location of its markets, depends heavily on raw-material hauls from other parts of the country, and does not supply the cement types needed within the East Siberian region. Because of a shortage of natural cement materials within the region, it is proposed that cement production be based on the utilization of by-products of other industries, such as alumina production.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.