Abstract
A 500 MHz superconducting cavity will replace the current copper cavity and begin to operate in the beginning of the year 2003. A liquid helium cryogenic system provides the cavity at 4.5 K a cooling capacity of 255 W without LN2 pre-cooling and a liquefaction rate of 110 liter/hour with LN2 pre-cooling. A safety factor of 1.5 is used to estimate the heat load from the superconducting cavity and the heat loss from the transfer lines. With the LN2 pre-cooling, this cooling system provides a cooling capacity of up to 450 W to cool down the additional superconducting Landau cavity. The capacity of the system can be tuned using a frequency driver installed at the compressor station. The pressure fluctuations of the dewar and of the suction line are kept to the same stability requirement that of the cavity cryostat to minimize the influence in cavity operation. A shutdown period for maintenance of more than 8000 hours for the cryogenic system is expected without interfering with the continuous operation of the superconducting cavity.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.