Abstract

According to the structure and construction characteristics of prestressed concrete (PC) continuous beam bridge and combined with the construction monitoring method of continuous beam bridge, this paper introduces the girder deflection test technology and method of prestressed concrete continuous box girder bridge, also analyzes the various factors which affect the linear monitoring. And draw the conclusion through the analysis of the deflection and linear monitoring of LinGang big bridge.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.