Abstract

The operational mode of thermal power plants has been changed from base load to duty cycle. From the changeover, fossil power plants cannot avoid frequent thermal transient states, for example, start up and stop, which results in thermal fatigue damage at the heavy section components. The rotor is the highest capital cost component in a steam turbine and requires long outage for replacing with a new one. For an optimized power plant operational life, inspection management of the rotor is necessary. It is known in general that the start-up and shutdown operations greatly affect the steam turbine life. The start-up operational condition is especially severe because of the rapid temperature and rotational speed increase, which causes damage and reduction of life of the main components life of the steam turbine. The start-up stress of a rotor which is directly related to life is composed of thermal and rotational stresses. The thermal stress is due to the variation of steam flow temperature and rotational stress is due to the rotational speed of the turbine. In this paper, the analysis method for the start-up stress of a rotor is proposed, which considers simultaneously temperature and rotational speed transition, and includes a case study regarding a 500MW fossil power plant steam turbine rotor. Also, the method of quantitative damage estimation for fatigue-creep damage to operational conditions, is described. The method can be applied to find weak points for fatigue-creep damage. Using the method, total life consumption can be obtained, and can be also be used for determining future operational modes and life extension of old fossil power units.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call