Abstract

In order to improving the launching technique in soft layer, the paper proposed the soil-chamber under pressure on the launching technique basing on engineering practices. The main principle is: using the earth pressure equilibrium, grouting the filling material when the Shield launching, establishing the active earth pressure ahead of time, which makes in advance the action pressure supports to the coarse sand cross section, that prevents from the water and soil spouting effectively. Because the active earth pressure, enhance the initial sending safety coefficient, and shorten the reinforcement length of the initial launching, and decrease the initial launching cost.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.