Abstract

The Landsat Data Continuity Mission (LDCM) is being developed by NASA and USGS and is currently planned for launch in January 2013 [1]. Once on-orbit and checked out, it will be operated by USGS and officially named Landsat-8. Two sensors will be on LDCM: the Operational Land Imager (OLI), which has been built and delivered by Ball Aerospace & Technology Corp (BATC) and the Thermal Infrared Sensor (TIRS)[2], which was built and delivered by Goddard Space Flight Center (GSFC). The OLI covers the Visible, Near-IR (NIR) and Short-Wave Infrared (SWIR) parts of the spectrum; TIRS covers the Thermal Infrared (TIR). This paper discusses only the OLI instrument and its pre-launch characterization; a companion paper covers TIRS.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call