Abstract

There is a 333.586 m length tunnel for parking and cross -over track at the north Gulou station between Gulou station and Xuanwumen stat ion , which the largest span is 17.358 m. The spacing interval is small, and the smallest is 0. The tunnel has many chambers, and the section area is varied. A 320.6 m length tunnel goes through the soft muddy and silty ground at the south Xuanwumen station . The tunnel crown is located 8 m to 9 m below the ground sur face, where there are structures on the ground, pipeline and built constructions under the tunnel. All the constructions therefore must be secur e and st eady in the process of excavating. The pape r analyze s both the construct ion difficulty and features of large span and parking cross -over track tunnel in the soft flow mucky ground. The construction method of bench cut method , center diagram method (CD method) and both side drift method are adopted on the base of the theor y. Finally the paper introduces the construction scheme and support method in the soft flow mucky ground. From the effect of construction , it is conclude d that the construction method and the reinforcement method are right. In a wor d, the constructions are secur e and steady in the whole process of construction.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.