Abstract

The JET programme is strongly focused on preparations for ITER construction and exploitation. To this end, a major programme of machine enhancements has recently been completed, including a new ITER-like wall, in which the plasma-facing armour in the main vacuum chamber is beryllium while that in the divertor is tungsten—the same combination of plasma-facing materials foreseen for ITER. The goal of the initial experimental campaigns is to fully characterise operation with the new wall, concentrating in particular on plasma-material interactions, and to make direct comparisons of plasma performance with the previous, carbon wall. This is being done in a progressive manner, with the input power and plasma performance being increased in combination with the commissioning of a comprehensive new real-time protection system. Progress achieved during the first set of experimental campaigns with the new wall, which took place from September 2011 to July 2012, is reported.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.