Abstract

The Great East Japan earthquake and tsunami on March 11th 2011 caused mass destruction, significant loss-of-life and a large displacement of people. It also placed significant strain of Japan’s electricity-generating infrastructure. There was a significant reduction in capacity due to the damage in thermal generation and gradual closure of Japan’s nuclear power plants; the ability for load-balancing across the Japanese grid was compromised due to limited interconnections between the different utilities that comprise the Japanese electricity system. This paper looks at the first fifteen months following the earthquake and tsunami: outlining the supply reduction and consequent attempts to manage the demand. In turn it highlights the foibles of Japan’s vertically-integrated monopolistic structures and the evolution of governmental and utilities response that went from decisions made “on-the-fly” to a more developed policy for peak-demand electricity savings. The findings from this paper should serve as a useful set of examples to aid decision makers in contingency planning for disruptive large-scale reduction in electricity-generating capacity.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.