Abstract

Construction of the ITER magnet systems has been started at the end of 2007 following the signature of the first procurement arrangements (PA) for the toroidal field (TF) conductors. Six ITER members are involved in the share of the ITER magnet components and, to date, eighteen PA between the ITER Organization and six domestic agencies have been signed. Substantial progress towards full-scale construction has been achieved with the placement of the first large manufacturing contracts, the production of several tens of tons of advanced Nb3Sn and NbTi strand, and the set-up of large cabling and jacketing facilities. The detailed design of the coils and support structures has also been finalized. The qualification of the fabrication processes for the TF coils and poloidal field (PF) coils has been initiated. The detailed design of the central solenoid (CS) coils is being developed. The design of the correction coils (CCs) with their support structures has been finalized, as well as for the TF gravity supports and clamps of the PF coils. The manufacture of prototypes of the feeder lines and current leads has been started, while ITER is in charge of the procurement of the required magnet instrumentation. This paper provides a progress report on the ITER magnet construction as per December 2010.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.