Abstract

This paper discusses the selection of compensation shunt reactors for a double-circuit 400 kV transmission line using the example of the newly built Elk Bis – Alytus transmission line. The analysis takes into account various conditions of the power system. The published results relate to voltage levels in steady states and during switching processes and short circuits. DOI: 10.12736/issn.2300-3022.2015210

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.