Abstract

Cost control in the wind power construction project is essential under the trend of developing wind power in China. In order to carry out cost control effectively, structural interpretation model(ISM) is used to identify and analyze the major factors that affect the implementation of cost control and the hierarchy relationships between each other. In this way, the surface causes, the middle causes and the underlying causes that affect the cost control in the wind power construction project have been found, which provides decision theory for the smooth implementation of cost control in China's current wind power construction projects.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.