Abstract

ABSTRACT A production information management system based on industrial Internet of Things (IoT) technology is designed, which makes the manufactory enterprise have the ability of dynamic shop floor scheduling. To solve the rescheduling problem, a hybrid method combining the game theory method and the rolling horizon rescheduling strategy (HGR) is proposed. In a computational experiment, the values of the relative error (RE) and mean ideal distance (MID) are 11.3 and 13.74, respectively, which illustrates the feasibility and efficiency of the proposed HGR method. An engineering experiment shows that the proposed method can handle the practical engineering problems.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call