Abstract

Due to the effect of various additional stress,cement concrete pavement repair material and the original road interface been damaged,which cause pavement breakdown. In order to solve this problem,this paper analyzing the reason of new and old concrete interface weakness and the require of interface bonding performance,the flexural bonding experiment method is used to test performance,and to verify slag base as a new type of repair material,which matched with cement paste contains expansion agent as an interface boning agent.Results shows that this new repair material can satisfy the interface bonding performance requirements very well.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.