Abstract
The integration of railway signaling and communication realizes the bidirectional information transmission between trains and ground control centers. In order to take full advantage of such information integration, this paper presents the integration architecture of train scheduling and control based on the model predictive control with the hierarchical structure of top (macroscopic), middle (mesoscopic) and bottom (microscopic) levels. The top level realizes the real-time train scheduling, the middle level guarantees trains to run with safety distances and implement the real-time operation plans produced by the top level, and the bottom level accomplishes the energy control and drives the trains to run according to the set-points engendered by the middle level. The proposed hierarchical feedback control can optimize the train operation, shorten the departure interval, improve the railway line density, ensure the safety of railway transportation, and eventually fulfill the Real-time, Automatic, Predictive, Intelligent Scheduling and control for hIgh-Speed Trains (RAPISIST).
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.