Abstract
The storage block allocation, the yard truck and yard crane scheduling are three separate sub-problems in container terminals, playing an important role in the efficiency of port discharging operations. This paper proposes an integer programming model considering these three problems as a whole. The objective is to minimize the time when all the unloading operations have been completed and all containers have been stacked at storage block. A Local Sequence-Cut (LSC) method is developed to solve the problem.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.