Abstract

Reconstructing the diversion tunnel as a permanent construction is not new in large underground hydropower plants' design, however most of them are taken as spillway tunnels or tailrace tunnels. A new design method of using diversion tunnel was proposed for further utilization. This paper analyzed the influence of using diversion tunnel on hydraulic transient of hydropower plants, including shaft surging, water hammer and dynamic properties of the governing system of the turbine. Calculation results verified the assumption that using diversion tunnel could reduce chamber diameter of surge shaft. The results provide reference to future design for underground hydropower plants.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.