Abstract

A procedure is presented of calculating the dependence on supply voltage of the operating parameters of wind-power plants hooked up to the power grid via double-fed asynchronous machines.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call