Abstract

Results from a study aimed at analyzing how the main critical elements of the P-88 heat-recovery boiler used as part of a PGU-325 power unit and the thermally stressed state of these elements influence the time taken to carry out the operations for starting the power unit.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call