Abstract

This contribution proposes an optimization of material flow by means of modernizing of forging lines - type induction furnace / crank forging press / trimming press. The basis of design of forging line treatment is placement of hydraulic shear machine for shearing of heated bar to semi-products before respective forging of forged pieces. This method helped to remove previous redundant workplace for semi-products preparation, which causes reduction of technologic operations and substantial decrease of material flow in die forge. Proposed variant of material flow optimization brings economic profit by means of reduction of production times and fuels costs intended for pallets transport. Given save will be interesting for die forges as it contains also calculation of logistical effect.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.