Abstract

This paper assesses the impacts of a GTL plant on the expansion of Brazil's oil refining segment. The GTL plant (50,000 bpd) was sized to start up operations in 2015, producing diesel and naphtha through the indirect route (FT-synthesis). This plant will consume the non-associated natural gas production from the recent discoveries at the Santos Basin (around 419 Bm 3), and the associated gas production from the Campos Basin. Both basins are located in the Southeast of Brazil, the most populated, rich and industrialized region of the country. Two different criteria for refinery expansion were simulated in order to meet oil product demand scenarios. Findings show that depending on the refinery expansion criteria considered GTL will play a fundamental hole to meet the oil product demand forecast to Brazil in the next 10 years.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call