Abstract

This, research work was to study the potential of M-sand as compared to river sand in concrete, here M-sand is replaced by river sand 0%,45%,50%,55% and 100% in the concrete mix, Mix design is designed as per IS Standards. In this research a mix 1:2.32:2.82 (M20) was considered. The test specimen was casted for 7days, 28 days and 90days. The performance of M-sand was determined by several experiments such as slump test, impact strength test, flexural Strength, and compressive strength test. The results attained from each test states that as M-sand increases the slump value decreases. flexural strength, compressive strength and impact test of concrete at 7 days, 28 days and 90 days is greater at 100% and 50% replacement of M sand by river sand.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.