Abstract

Short lead time reduces the exposure of demand forecasting risk, but an additional production cost is incurred to pay it. To solve this trade-off problem, a model is proposed based on classical newsvendor problem with lead time as a controllable variable. In this model, the demand forecasting process and the production cost structure are assumed as general functions with the amount of compressed lead time, respectively. Our investigation shows that under some circumstances, the trade-off problem can be solved and the proposed model can increase the profitability of enterprise. Finally, some numerical examples are given to illustrate the model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.