Abstract

Railway signalling and electrification engineers face many challenges in the integration of signalling systems with traction power. Signalling involves sensitive detection and evaluation processes to determine the state of the railway and permissible train movements, which if disturbed could lead to an unsafe condition. Electrification systems necessarily involve high power and consequently the potential to generate radiated and conducted electromagnetic interference. This paper presents a discussion of the subsystems and components employed in existing signalling, and the potential impacts of electrification on those subsystems. The changing relationship arising from recent developments in signalling and traction systems is investigated. The opportunities presented by integrated control systems, bringing together the control of signalling, traction, communications and information systems are discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.