Abstract

This study determined the influence of precipitation occurring in the sewerage catchment basin in Nowy Targ (Poland) on the amount of wastewater inflow to the wastewater treatment plant, and determined the costs resulting from the treatment of accidental (rain) water entering the analyzed sewerage system. The research was conducted from 2016 to 2019, for which daily precipitation and average daily wastewater inflows in the so-called dry, normal, and very wet periods were analyzed. The research period was divided into six characteristic intervals in terms of precipitation. It was found that, on days with different precipitation intensity, the amount of accidental water as a proportion of the total amount of wastewater flowing into the plant ranges from 9.6% to 34.1%. The annual costs incurred by the operator resulting from the environmental fee are 1625.8 EUR/year. Alternatively, the costs resulting from financial expenditures for wastewater treatment processes amount to 337,651 EUR/year. The results of the research provide important information for sewage network operators to take effective actions to eliminate illegal connections of roof gutters and/or yard inlets to the sanitary collectors, and to replace the combined sewage system in Nowy Targ with a distributed sewerage system. This would reduce the costs of wastewater treatment and the irregularity of wastewater inflow.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.