Abstract

The smart hydropower station (SHS) is an important research direction of the power system. The smart equipment is the most important part of the SHS. The holographic management of equipment is the foundation of the smart equipment. In order to meet the requirements of the SHS and smart equipment, a holographic management system for equipment has been developed with the construction of hydropower stations. During the design period, the 3D digital models have been built by 3D design software and assigned with KKS codes. During operation and maintenance period, firstly, the images of hydropower stations have been collected as well as posted onto surfaces of models. Subsequently, the 3D hydropower station has been assembled, the lightweight version has been released. And then, the data have been integrated and the relationships between models and data have been established based on KKS codes. Finally, the holographic management system has been developed.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call