Abstract
Analyzed the sediment-transport process in high sediment-laden river, the new concept and calculating method for sediment-transport water volume are proposed. Based on field data of sediment and water volume in the Lower Yellow River from 1950 to 2000, the sediment-transport water volume and unit sediment-transport water volume in LYR are calculated. Meanwhile, relations between them and influencing factors are confirmed to calculate efficient sediment-transport water volume after construction of the Xiaolangdi reservoir. Results gained from these functions are consistent well with the facts of real water-sediment regulation in LYR.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.