Abstract

Gjøa was the largest field development project in Norway in 2010. Gjøa was proven in 1989 and are now being developed together with nearby Vega satellites. The combined reserves are estiThe recent Gjøa field development in the North Sea has many features that are relevant for the oil and gas developments north of Western Australia. While the field location is not very similar to the north of Western Australia, the field development solution is very relevant. Several subsea clusters are tied back to a semi-submersible platform with export of gas and condensate via pipelines to shore. Other aspects to the project that are relevant to Western Australia are split location engineering between Norway and India, fabrication of the hull in Korea and subsequent heavy lift transport to the assembly yard, pre-installation of the mooring system, and tow to field with ocean going tug boats. The semi concept, which was used for the Gjøa development, is a mature technology with few technical challenges on a conceptual level. On the other hand the building of an oil and gas platform for A$2 billion has many challenges, both economical and technical, that have to be solved to have a successful project for both the client and the contractor.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.