Abstract

ABSTRACT Concern about adequate tritium resources to start up deuterium-tritium (DT) fusion reactors in the near term is misplaced: Proposed demonstration reactors and pilot plants will not realistically be buildable for a great many decades. More disturbing, tritium fuel self-sufficiency of eventual DT reactors may be unattainable, because it is unlikely that tritium-breeding blankets can completely replenish burned-up fuel as well as unburned tritium that is lost in numerous reactor subsystems. The concept of doubling time is unworkable. The only viable fuel solution for sustained operation demands deuterium-based reactors where the tritium is concurrently generated and burned up in the fusioning plasma.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.