Abstract

Hales Bar Dam was built on cavernous Mississippian limestone, by a private power company, from 1905 to 1913. Inadequate foundation treatment and lack of realization of the true conditions beneath the dam resulted in serious leakage through the foundation. Several attempts were made to stop the leaks, but none were successful until a four-year repair program was undertaken by the Tennessee Valley Authority, in 1940. Most of the caves were the result of solution of shattered limestone along two small thrust faults.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.