Abstract

HIRFL-CSR, a new accelerator project planned at the Heavy Ion Research Facility in Lanzhou (HIRFL), has been started in December 1999. The average static pressure for the ultra-high vacuum system of HIRFL-CSR will be 3×10 −9 Pa. To achieve this goal, much research and many experiments have been done. As a result, the first prototype of the vacuum system has been finished. The pressures near the pump and at the end of the chamber (about 4 m away from the pump) were 8×10 −10 and 2.6×10 −9 Pa, respectively. This paper describes the process of the design, manufacture and test on the prototype. It is focused on the chamber structure design, machining technology, calculation and testing for the main pumps, and design of the bake-out system. Future development of the vacuum system is also mentioned.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.