Abstract

This paper presents a study of a major, multinational program of Enterprise Systems (ES) implementation. The case study subject is a hi-tech manufacturer. The study focuses on the issue of user participation. The investigation inquires into the fact that the implementation method espoused user participation even though the outcome of the project was already known. (Regardless of user input, the ES would be deployed). The paper reports that user participation was deployed to serve the interests of the project manager in reporting local circumstances as the implementation project moved across different sites. The framework for this inquiry was Multiview2, the latest generation of the Multiview information systems (IS) method. The structure of Multiview2 was used as a diagnostic device in order to inquire into the characteristics of the ES method used at the case study sites.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.