Abstract

Reservoir power stations are the most appropriate mechanism for achieving production of the peak power, next to the pumped storage power stations and run-of-river power stations. The optimum hydro power station chain operation of the flow accumulation requires the adjustment of the river flow along the entire hydro power station chain. This article deals with the feasibility of attaining additional peak power generation along the chain of hydro power stations on the river Drava. The two central problems emerging at hydro power stations on the river Drava are the reduced installed flow at Dravograd HPS. The main purpose of this research has been to exploit all the technical possibilities for the rise of the installed flow in Dravograd HPS, in addition to offer its financial feasibility

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.