Abstract
Based on USNRC GL 90-05 and 91-18, the implementations of non-code repairs to stop the leakage of the class 3 moderate piping without the plant shutdown for code repairs have been established in Taiwan. This paper presents the experiences of the implements of the non-code class 3 piping repairs in Taiwan Power Company's BWR and PWR plants. The comprehensive procedures provide a sound and effective managing strategy to repair the leakage of the safety-related piping.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.