Abstract
In this journal [Production Planning and Control], there are three solution procedures: (1)The algebraic approach (2)Cauchy-Schwarz inequality and the arithmetic-geometric mean inequality approach, and (3)The calculus approach, to solve the integrated single-vendor single-buyer inventory systems with shortage. Two criteria are used to evaluate the three approaches. As argued in this note, we conclude that adopting the calculus approach to solve the inventory model is more recommended.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.