Abstract

Abstract In the paper the evaluation of efficiency of the use of machines in the selected production company was presented. The OEE method (Overall Equipment Effectiveness) was used for the analysis. The selected company deals with the production of tapered roller bearings. The analysis of effectiveness was done for 17 automatic grinding lines working in the department of grinding rollers. Low level of efficiency of machines was affected by problems with the availability of machines and devices. The causes of machine downtime on these lines was also analyzed. Three basic causes of downtime were identified: no kanban card, diamonding, no operator. Ways to improve the use of these machines were suggested. The analysis takes into account the actual results from the production process and covers the period of one calendar year.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.