Abstract

ABSTRACT A common method of estimating remaining reserves is decline curve analysis. There is a tendency to believe that estimates of remaining reserves will improve (become closer to truth) as more production data becomes available. This is not necessarily true even though our estimate of the ultimate recovery will generally improve with increased production history. The use of curve fitting techniques will not necessarily increase the accuracy of estimating remaining reserves and may, in some cases, lead to unreasonable answers. Reserve estimates will also vary among reserve estimators using the same data. This variance can be significant as demonstrated by the results of a controlled experiment presented in this paper.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.